• head_banner_01

Products

2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The very rich projects management experiences and one to one service model make the high importance of business communication and our easy understanding of your expectations for Spool In Mainframe , Muncie Speedometer Gear , Right Drum , We welcome you to definitely join us in this path of making a affluent and productive business together.
2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong Detail:

Drum Quantity Single
Drum Design LBS Groove Or Spiral Groove
Material Carbon Stainless And Alloy Steels
Size Customization
Application Range Construction Mining Terminal operation
Power Source Electric and hydraulic
Rope Capacity 100~300M

the use of environment:

1. Outdoor use is allowed;
2. The altitude does not exceed 2000M;
3. Ambient temperature -30℃ ~ +65℃;
4. It is allowed to work under rain, splash and dust conditions.

Product Model:

This rebus reel model is: LBSZ1080-1300
Represents the diameter of the Ribas drum is 1080mm, the length is 1300mm,

Precautions for the use of crane winch

1,The wire ropes on the crane drum should be arranged neatly. If overlap and oblique winding are found, they should be stopped and rearranged. It is forbidden to pull the wire rope by hand or foot in rotation. The wire rope shall not be completely released, at least three laps shall be reserved.
2, crane wire rope is not allowed to knot, twist, in a pitch break more than 10%, should be replaced.
3. In the crane operation, no one shall cross the wire rope, and the operator shall not leave the hoist after the object (object) is lifted. Objects or cages should be lowered to the ground when resting.
4. In the operation, the driver and signalman should maintain good visibility with the lifting object. The driver and signalman should cooperate closely and obey the unified command of the signal.
5. In case of power failure during crane operation, the power supply should be cut off and the lifting object should be lowered to the ground.
6, work to listen to the signal of the commander, the signal is unknown or may cause accidents
The operation should be suspended and the operation can be continued until the situation is clear.
7. In case of sudden power failure during crane operation, the brake knife should be opened immediately to put down the goods.
8. After the operation is completed, the material tray should be landed and the electric box should be locked.
9, crane wire rope in the process of use and mechanical wear. Spontaneous combustion corrosion of local damage is unavoidable, should be intervals coated with protective oil.
10. Overloading is strictly prohibited. That is, more than the maximum carrying tonnage.
11. Attention should be paid not to knot the crane during use. Crush. Arc wound. Erosion by chemical media.
12, shall not be directly lifted high temperature objects, for objects with edges and corners to add protection plate.
13, in the process of use should often check the wire rope used, reach the scrap standard should be scrapped immediately.


Product detail pictures:

2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong detail pictures

2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong detail pictures

2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong detail pictures

2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong detail pictures

2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong detail pictures


Related Product Guide:

We thinks what buyers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better high-quality, reduced processing costs, charges are more reasonable, won the new and outdated consumers the support and affirmation for 2021 China New Design Quadruple Drums - lebus grooved drum for tower crane – Junzhong , The product will supply to all over the world, such as: South Africa, Manchester, Slovakia, We firmly think that we have the full capability to present you contented merchandise. Wish to collect concerns within you and build a new long-term synergy romantic relationship. We all significantly promise:Csame excellent, better selling price; exact selling price, better quality.
  • We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
    5 Stars By Paula from Madras - 2017.03.07 13:42
    Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By Meredith from Iceland - 2017.12.31 14:53
    Write your message here and send it to us